SAFETY WARNING
Only qualified personnel should install and service the equipment. The installation, starting up, and
servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific
knowledge and training. Improperly installed, adjusted or altered equipment by an unqualified person could
result in death or serious injury. When working on the equipment, observe all precautions in the literature
and on the tags, stickers, and labels that are attached to the equipment.
Remote Split System Units
and Remote Chillers
Air Cooled Condensing Units
October 2012 SS-SVX11H-EN
Installation, Operation,
and Maintenance
Models
RAUJ-C20 RAUJ-C40 RAUJ-C80
RAUJ-C25 RAUJ-C50 RAUJ-D10
RAUJ-C30 RAUJ-C60 RAUJ-D12
Page view 0
1 2 3 4 5 6 ... 105 106

Summary of Contents

Page 1 - Installation, Operation

SAFETY WARNINGOnly qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating,

Page 2 - Environmental Concerns!

10 SS-SVX11H-ENUnit Dimensions & WeightsUnit ClearancesFigure 4, p. 10 illustrates the minimum operating and service clearances for either a sing

Page 3 - Introduction

Maintenance100 SS-SVX11H-ENTable 34. 20-60 Ton unit compressor circuit breakers (460-575 volts)1A/ 2A 1B / 2BUnit Voltage Dial Setting20 Ton46057520.

Page 4 - Table of Contents

MaintenanceSS-SVX11H-EN 101 Fuse Replacement DataFall Restraint - Condenser Section RoofThis unit is built with fall restraint slots located on unit t

Page 5 - SS-SVX11H-EN 5

Maintenance102 SS-SVX11H-ENMonthly MaintenanceAir Handling EquipmentBefore completing the following checks, turn the system control circuit switch 1S

Page 6 - Model Number Descriptions

MaintenanceSS-SVX11H-EN 103 1. Remove enough panels from the unit to gain safe access to coils..Important: Bridging between the main supports required

Page 7 - General Information

104 SS-SVX11H-ENWarranty and Liability ClauseCOMMERCIAL EQUIPMENT RATED 20 TONS AND LARGER AND RELATED ACCESSORIESPRODUCTS COVEREDThis warranty* is e

Page 8 - Unit Description

SS-SVX11H-EN 105 Wiring DiagramsNote: Published unit wiring diagrams (individual, separate diagrams for unitary product lines) are available via e-Lib

Page 9

Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the leader in creating and sustaining safe, com

Page 10 - Unit Dimensions & Weights

Unit Dimensions & WeightsSS-SVX11H-EN 11 DimensionsFigure 5. 20-Ton air-cooled condensing unit4" CONDUIT MAIN POWER1 3/4" KO LOW VOLTAG

Page 11 - Dimensions

Unit Dimensions & Weights12 SS-SVX11H-ENFigure 6. 20-Ton air-cooled condensing unit (connections)VOLTAGE ACCESSCONTROL PANEL5/8" O.D.LIQUID

Page 12

Unit Dimensions & WeightsSS-SVX11H-EN 13 Figure 7. 25- and 30-Ton air-cooled condensing unit1/2" X 4 KO (115V) 1 3/4" KO LOW VOLTAGE (30

Page 13

Unit Dimensions & Weights14 SS-SVX11H-ENFigure 8. 25- and 30-Ton air-cooled condensing unit (connections)HOT GAS BYPASS (OPTIONAL)LIQUID LINE7/8&

Page 14

Unit Dimensions & WeightsSS-SVX11H-EN 15 Figure 9. 40-Ton air-cooled condensing unit29 1/4"31 1/4"35 13/16"37 11/16"3 3/8"

Page 15

Unit Dimensions & Weights16 SS-SVX11H-ENFigure 10. 40-Ton air-cooled condensing unit (connections)1 5/8" O.D.SUCTION LINECOMPRESSORSCOMPRESS

Page 16

Unit Dimensions & WeightsSS-SVX11H-EN 17 Figure 11. 50-Ton air-cooled condensing unit29 1/4"31 1/4"35 13/16"37 11/16"3 3/8&quo

Page 17

Unit Dimensions & Weights18 SS-SVX11H-ENFigure 12. 50-Ton air-cooled condensing unit (connections)COMPRESSORSCOILCOMPRESSORCOIL15/8" O.D. SU

Page 18

Unit Dimensions & WeightsSS-SVX11H-EN 19 Figure 13. 60-Ton air-cooled condensing unit29 1/4"31 1/4"35 13/16"37 11/16"3 3/8&quo

Page 19

© 2012 Trane All rights reserved SS-SVX11H-ENWarnings, Cautions and NoticesWarnings, Cautions and Notices. Note that warnings, cautions and notice

Page 20 - PANEL SIDE

Unit Dimensions & Weights20 SS-SVX11H-ENFigure 14. 60-Ton air-cooled condensing unit (connections)COMPRESSORSCOILCOMPRESSORCOIL2 1/8" O.D. S

Page 21

Unit Dimensions & WeightsSS-SVX11H-EN 21 Figure 15. 80-Ton air-cooled condensing unit29 1/4"31 1/4"35 13/16"37 11/16"3 3/8&quo

Page 22

Unit Dimensions & Weights22 SS-SVX11H-ENFigure 16. 80-Ton air-cooled condensing unit (connections)1 1/8" O.D.LIQUID LINE2 1/8" O.D .SUC

Page 23 - 227 1/4”

Unit Dimensions & WeightsSS-SVX11H-EN 23 Figure 17. 100- and 120-Ton air-cooled condensing unit29 1/4"31 1/4"35 13/16"37 11/16"

Page 24 - 2 1/8” O.D. for vertical

Unit Dimensions & Weights24 SS-SVX11H-ENFigure 18. 100- and 120-Ton air-cooled condensing unit (connections)1 3/8"HOT GASBYPASS (OPTIONAL)1

Page 25

Unit Dimensions & WeightsSS-SVX11H-EN 25 Figure 19. 20-Ton evaporator chillerNotes:Notes:THIS HEAT EXCHANGER IS INTENDED FOR INDOOR INSTALLATION O

Page 26

Unit Dimensions & Weights26 SS-SVX11H-ENFigure 20. 25 and 30-Ton evaporator chillerNotes:THIS HEAT EXCHANGER IS INTENDED FOR INDOOR INSTALLATION

Page 27

Unit Dimensions & WeightsSS-SVX11H-EN 27 Figure 21. 40-Ton evaporator chillerNotes:Notes:THIS HEAT EXCHANGER IS INTENDED FOR INDOOR INSTALLATION O

Page 28

Unit Dimensions & Weights28 SS-SVX11H-ENFigure 22. 50 and 60-Ton evaporator chillerNotes:Notes:THIS HEAT EXCHANGER IS INTENDED FOR INDOOR INSTALL

Page 29

Unit Dimensions & WeightsSS-SVX11H-EN 29 Figure 23. 80 and 120-Ton evaporator chillerNotes:Notes:THIS HEAT EXCHANGER IS INTENDED FOR INDOOR INSTAL

Page 30

IntroductionSS-SVX11H-EN 3 IntroductionOverview of ManualNote: One copy of this document ships inside the control panel of each unit and is customer p

Page 31 - Heavy Objects!

Unit Dimensions & Weights30 SS-SVX11H-ENTable 3. Typical unit weights and point loading data 20 - 120 Ton unitsWeight CG Locations Weight on isol

Page 32 - Unit Isolation

Unit Dimensions & WeightsSS-SVX11H-EN 31 Use spreader bars as shown in Figure 25. See installation manual or nameplate for unit weight. See instal

Page 33

Unit Dimensions & Weights32 SS-SVX11H-ENUnit IsolationTo minimize unit sound and vibration transmission, one of the following installation method

Page 34 - Installation

Unit Dimensions & WeightsSS-SVX11H-EN 33 Table 6. Typical neoprene isolator selection & locationShipping WeightOperating WeightIsolator Part N

Page 35 - ”No Controls” Units

34 SS-SVX11H-ENInstallationFoundationIf the unit is installed at ground level, elevate it above the snow line. Provide concrete footings at each supp

Page 36 - 36 SS-SVX11H-EN

InstallationSS-SVX11H-EN 35 • Install chiller piping drain with shutoff valve.• Install 1/2” x 14 NPT stainless steel or PVC plug in braze plate chill

Page 37 - TXV for Remote Chiller

Installation36 SS-SVX11H-EN• Install an outside air thermostat in series with the flow switch to stop or prevent the unit from operating below the re

Page 38 - Equipment Damage!

InstallationSS-SVX11H-EN 37 Liquid Line Solenoid ValvesLiquid line isolation solenoid valves (one per refrigeration circuit) are required for refriger

Page 39 - Liquid Line Piping

Installation38 SS-SVX11H-ENAccess Valves (Ports)The access ports in the liquid line allows the unit to be charged with liquid refrigerant and is used

Page 40 - Dual-Circuit Examples

InstallationSS-SVX11H-EN 39 Suction Line PipingProper suction line sizing is required to guarantee that oil is returned to the compressor throughout t

Page 41

4 SS-SVX11H-ENTable of ContentsModel Number Descriptions . . . . . . . . . . . . . . 6General Information . . . . . . . . . . . . . . . . . . . .

Page 42 - Optional Pressure Gauges

Installation40 SS-SVX11H-ENNote: If the liquid line riser exceeds 10 feet, refer to Tube Size and Component Selection, publication number SS-APG012-E

Page 43

InstallationSS-SVX11H-EN 41 Typical Field-Installed EVP Chiller Evaporator Piping1. Install the TEV(s) directly to the unit liquid connection. See TEV

Page 44 - Water Treatment

Installation42 SS-SVX11H-ENthe coil frosting is sensed. The compressor is allowed to operate when the coil temperature rises a few degrees above the

Page 45 - Chilled Water Piping

InstallationSS-SVX11H-EN 43 Final Refrigerant Pipe ConnectionsTo access the refrigerant pipe connections, remove the louvered side grills. These conde

Page 46 - Evaporator Damage!

Installation44 SS-SVX11H-ENNote: Use 40 to 45% silver brazing alloy (BAg-7 or BAg-28) on dissimilar metals. Use BCup-6 brazing alloy on copper to cop

Page 47

InstallationSS-SVX11H-EN 45 system capacity. Proper water treatment must be determined locally and depends on the type of system and local water chara

Page 48 - Use Copper Conductors Only!

Installation46 SS-SVX11H-ENBPHE). A field provided blow down valve (recommended) or plug must be installed in strainer cleanout if not present.Chille

Page 49 - Equations

InstallationSS-SVX11H-EN 47 heat exchanger are also useful for EVP chiller service and shutdown.Water Pressure Gauges. Install pressure gauge(s) to mo

Page 50 - 50 SS-SVX11H-EN

Installation48 SS-SVX11H-ENNotes: 1. Shutoff valves are required for evaporator servicing. 2. Evaporator is shown for illustration purposes only. 3.

Page 51

InstallationSS-SVX11H-EN 49 Main Unit Power WiringTable 12, p. 49 lists the field connection wire ranges for both the main power terminal block 1TB1 a

Page 52

SS-SVX11H-EN 5 Adding Preliminary Charge . . . . . . . . . . . 86Compressor Start-Up (All Systems) . . . . 86Pressure Curves . . . . . . . . . .

Page 53 - Hazardous Voltage!

Installation50 SS-SVX11H-ENTo correctly size the main power wiring for the unit, use the appropriate calculation(s) listed below. Read the load defin

Page 54 - Economizer Actuator Circuit

InstallationSS-SVX11H-EN 51 Table 14. Electrical service sizing data (20-60 Ton units) Unit Characteristics Condenser Fan Motor Compressor MotorModelE

Page 55 - No System Control

Installation52 SS-SVX11H-ENField Installed Control WiringBefore installing any connecting wiring, refer to Figure 5, p. 11 to Figure 18, p. 24 for th

Page 56 - 2307-9122

InstallationSS-SVX11H-EN 53 • Chilled water flow switch wiring (EVP units);• Outside air thermostat wiring (EVP units);• Liquid line solenoid valve(s)

Page 57

Installation54 SS-SVX11H-ENControls using DC Analog Input/OutputsBefore installing any connecting wiring between the unit and components utilizing a

Page 58 - 2307-9144

InstallationSS-SVX11H-EN 55 No System ControlTemperature Control ParametersEach unit ordered with the “No Controls” option, requires a field provided

Page 59

Installation56 SS-SVX11H-ENFigure 39. Field connection diagram RAUJ20-60 - no system control2307-9122

Page 60

InstallationSS-SVX11H-EN 57 Figure 40. Field connection diagram notes - RAUJ 20-60 - all system controls

Page 61

Installation58 SS-SVX11H-ENFigure 41. Field connection diagram RAUJ80-120 - no system control2307-9144

Page 62

InstallationSS-SVX11H-EN 59 Figure 42. Field connection diagram notes - RAUJ 80-120 - all system controls21 ISOLATION LIQUID SOLENOID VALVES (6L1, 6L3

Page 63 - EVP Chiller Control

6 SS-SVX11H-ENModel Number Descriptions20 to 60-Ton Units1DIGIT 1 — UNIT TYPER = Condensing UnitDIGIT 2 — CONDENSERA = Air CooledDIGIT 3 — AIRFLOWU =

Page 64

Installation60 SS-SVX11H-ENVariable Air Volume Control (Honeywell W7100A)In a variable air volume system, the desired space temperature is maintained

Page 65 - Required!

InstallationSS-SVX11H-EN 61 Refer to wiring notes on Figure 42, p. 59.Figure 44. Field connection diagram RAUJ80-120 - variable air volume control2307

Page 66

Installation62 SS-SVX11H-ENDischarge Air Sensor (Honeywell 6RT3 or Honeywell 8RT3) Discharge Air SensorEach unit ordered with variable air volume con

Page 67

InstallationSS-SVX11H-EN 63 Night SetbackIf night setback operation is desired, connect a set of normally open contacts (field provided) to the approp

Page 68

Installation64 SS-SVX11H-ENRefer to wiring notes on Figure 40, p. 57.Figure 47. Field connection diagram - RAUJ-C20-60 - EVP chiller applications2307

Page 69

InstallationSS-SVX11H-EN 65 See wiring notes on Figure 42, p. 59..A ground wire must be installed between the EVP remote panel and the unit control pa

Page 70 - System Pre-Start Procedures

Installation66 SS-SVX11H-ENFor 40 through 60 Ton units, requiring four (4) stages of operation, a 402 ohm resistive jumper must be installed across

Page 71

InstallationSS-SVX11H-EN 67 Refer to wiring notes on Figure 40, p. 57.Figure 49. Field connection diagram - RAUJ-20-60 constant volume control applica

Page 72

Installation68 SS-SVX11H-ENElectronic Zone Thermostat (Honeywell T7067)Each unit ordered with constant volume controls (in the model number) is shipp

Page 73

InstallationSS-SVX11H-EN 69 Discharge Air Sensor (Honeywell 6RT1)A discharge air sensor ships with each unit when the constant volume control option i

Page 74

SS-SVX11H-EN 7 General InformationUnit InspectionAs soon as the unit arrives at the job site• Verify that the nameplate data matches the data on the s

Page 75

70 SS-SVX11H-ENSystem Pre-Start ProceduresUse the checklist provided below in conjunction with the “General Unit Requirement” checklist” to ensure th

Page 76

System Pre-Start ProceduresSS-SVX11H-EN 71 The lines used to connect pump to the system should be copper and the largest diameter that can practically

Page 77 - Voltage Imbalance

System Pre-Start Procedures72 SS-SVX11H-ENDischarge Air Controller Checkout (Honeywell W7100A)Note: The following checkout procedure must be performe

Page 78

System Pre-Start ProceduresSS-SVX11H-EN 73 20. Turn the control circuit switch 1S2, in the unit control panel, and the main power disconnect switch to

Page 79 - Operating Principals

System Pre-Start Procedures74 SS-SVX11H-ENfor the condensing unit and the control circuit switch 1S2, in the unit control panel, is “OFF”.2. Verify t

Page 80 - Thermostatic Expansion Valve

System Pre-Start ProceduresSS-SVX11H-EN 75 11. At the Chilled Water Controller, use a digital voltmeter to verify there is 24 volts AC across terminal

Page 81 - Condenser Fans

System Pre-Start Procedures76 SS-SVX11H-ENInsulate the wires with tape to prevent shorting or grounding during control checkout.4. Close the main pow

Page 82 - Hot Gas Bypass Operation

System Pre-Start ProceduresSS-SVX11H-EN 77 Discharge Air Sensor Checkout (Honeywell 6RT1) Available Only For 20 - 60 Ton Units1. Turn the control circ

Page 83 - Start-Up

System Pre-Start Procedures78 SS-SVX11H-EN• VD (reading farthest from average) = 221The percentage of Imbalance equals:• 100 x[(226 - 221)/226)] = 2.

Page 84

SS-SVX11H-EN 79 Operating PrincipalsVAV W7100A Discharge Air Controller (7U11) The discharge air controller used in Variable Air Volume applications i

Page 85

General Information8 SS-SVX11H-ENOn 80-120 Ton units, the CSHN*** compressors come equipped with a compressor protection device capable of detecting

Page 86

Operating Principals80 SS-SVX11H-ENChilled Water Temperature Controller (6U11)The chilled water temperature controller used with EVP chiller applicat

Page 87

Operating PrincipalsSS-SVX11H-EN 81 Condenser FansCondenser fan cycling is accomplished through interlocking fan contactors with a combination of comp

Page 88

Operating Principals82 SS-SVX11H-ENLow Ambient DampersLow Ambient Dampers are available as a factory installed option or can be field-installed. Damp

Page 89

SS-SVX11H-EN 83 Start-UpLow Ambient Damper Adjustment (Factory or Field Installed)When a unit is ordered with the low ambient option (i.e., Digit 11 i

Page 90 - Compressor Damage!

Start-Up84 SS-SVX11H-EN5. Turn the main power disconnect switch or circuit protector switch for the unit to the “On” position.6. Turn the field provi

Page 91

Start-UpSS-SVX11H-EN 85 Information in Table 22, p. 85 is approximate and intended to simplify field adjustment by presetting valves to approximately

Page 92 - Pressure Curves

Start-Up86 SS-SVX11H-ENAdding Preliminary Charge1. Leak check must be completed and system evacuated.2. Verify that oil levels are near or above the

Page 93

Start-UpSS-SVX11H-EN 87 8. Switch the field supplied unit disconnect "OFF". Open the unit control box and plug in the reset relay (1K21 or 1

Page 94

Start-Up88 SS-SVX11H-ENi. Turn the field supplied disconnect switch or circuit protector switch that provides power to the condensing unit to the “Of

Page 95 - Final System Setup

Start-UpSS-SVX11H-EN 89 f. Subtract the total charge already added from the Table 24, p. 91 charge estimate for condensing unit at the appropriate pip

Page 96

General InformationSS-SVX11H-EN 9 Figure 2. Component layout and ‘ship-with’ locations 20 - 60T units(a)(a) 60T unit shownCondenserCoilAccessPanelsLif

Page 97

Start-Up90 SS-SVX11H-ENl. If in step 9. the fan pressure control switches were disabled to allow for charging below 80°F outdoor temperature, disconn

Page 98 - CSHN Compressors (80-120T)

Start-UpSS-SVX11H-EN 91 Compressor Crankcase Heaters7.5 thru 15 Ton CSHD compressors use one 90-watt heater per compressor. 15 and 20 Ton CSHN compres

Page 99

Start-Up92 SS-SVX11H-ENPressure CurvesTo Check Operating Pressures1. Start the unit and allow the pressures to stabilize.2. Measure the outdoor air d

Page 100 - Maintenance

Start-UpSS-SVX11H-EN 93 Figure 67. 25 Ton cooling cycle pressure curve(a)(a) All compressors and condenser fans runningFigure 68. 30 Ton cooling cycle

Page 101 - Falling Off Equipment!

Start-Up94 SS-SVX11H-ENFigure 71. 60 Ton cooling cycle pressure curve(a)(a) All compressors and condenser fans runningFigure 72. 80 Ton cooling cycle

Page 102 - Condensing Unit

Start-UpSS-SVX11H-EN 95 Final System SetupAfter completing the Pre-start and Start-up procedures outlined in the previous sections, perform these fina

Page 103 - NOTICE:

Start-Up96 SS-SVX11H-EN• Turn the 115 volt control circuit switch 1S2 “Off” and program the Night Setback (NSB) panel (if applicable) for proper unoc

Page 104 - Warranty and Liability Clause

SS-SVX11H-EN 97 Maintenance Compressor Operational SoundsThe following discussion describes some of the operational sounds of Trane R-410A scroll comp

Page 105 - Wiring Diagrams

Maintenance98 SS-SVX11H-ENImportant: Do not spill compressor oil. Refrigerant oil is detrimental to some roofing materials. Care must be taken to pro

Page 106

MaintenanceSS-SVX11H-EN 99 Note: Always replace gasket when reassembling oil equalizer lines.Electrical Phasing: It is very important to review and f