Trane GETB User Manual Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
WSHP-SVN08B-EN 7
SWAGE 3" (76)
G
G
H
J
UNITS WITH TOP DISCHARGE ARE 80" (2032) IN HEIGHT
ALL OTHER UNITS ARE 88" (2235) IN HEIGHT
FROM 96" (2438)
TO 120" (3048)
2 1/2" (63.5)
E
F
DRAIN
CONNECTION
D
4 3/4"
(121)
60" (1524)
3/4" (19) O.D.
CHASSIS
ACCESS
PANEL
THROWAWAY
FILTER
CONTROL BOX
C
LOW VOLTAGE
CONNECTION BOX
FOR THERMOSTAT
SUPPLY-AIR
OPENING
1 1/4" (32)
1/2" (12.7) O.D.
ELECTRIC CONDUIT
1" (25.4)
1"
(25.4)
B
A
1" (25.4)
3 3/4"
(95)
8" (203)
12 1/2"
(318)
3 3/4"
(95)
8" (203)
12 1/2"
(318)
RETURN
SUPPLY
DRAIN
OPTIONAL
DUCT OPENING
1" (12.7) DUCT
COLLAR
RSD
VARIES DEPENDENT
ON RISER O.D.
TOP
FRONT RIGHT SIDE
11" (279) FOR 80" (2032) CABINET HEIGHT
3" (76) FOR 88" (2235) CABINET HEIGHT
SUPPLY-AIR OPENINGS AND RISER LOCATIONS CANNOT
BE ON THE SAME SIDE OF THE UNIT.
RISER LOCATION CAN BE ON ANY SIDE EXCEPT FRONT,
AND MAY BE SUPPLIED BY TRANE OR BY OTHERS.
NOTE:
RIGHT RISER
LOCATION SHOWN
IN FRONT AND RIGHT
VIEWS.
RISER CONNECTION
1/2” (13) NPTE = 009-018
3/4” (19) NPTE = 024,036
Dimensions
GET 009-036
GET A B C D E F
009, 012 16 1/4" (413) 16 1/4" (413) 8 1/8" (206) 39 1/8" (994) 14 3/4" (375) 3/4" (19)
015-018 18" (457) 20" (508) 10" (254) 40 5/8" (1032) 18 3/4" (476) 3/4" (19)
024-036 24" (610) 24" (610) 12" (305) 49 5/8" (1260) 22 5/8" (575) 3/4" (19
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 31 32

Comments to this Manuals

No comments